HGE provided architectural and engineering consulting services for the construction of an approximately 315 foot x 60 foot pre-engineered metal building for the City of Bandon Public Works Department and Bandon Electric Utility. A slab-on-grade foundation was designed for large service truck traffic, and a 1,400 sq. ft. overhead storage loft over interior offices was also designed in the middle of the facility, independent of the manufactured steel framed building. Program spaces included 8 bays on each side, tool rooms, storage, lockers, crew room, training room, and other support spaces. Work included foundation preparation, foundation, driveway apron, steel fabrication, exterior doors, overhead doors, windows, plumbing, mechanical, electrical, and other related work.

Size19,000 SQ FT
Cost$1.3M
On-Time/On-BudgetYes
Construction Period7 Months
CompletedNovember 2016
Services Provided
Full scope architectural and engineering services
References
Richard Anderson
Bandon Public Works Director
541.347.2437

Don Thompson
President Donald W. Thompson, Inc.
541.756.7511