About hge2user

This author has not yet filled in any details.
So far hge2user has created 46 blog entries.

Coos Bay Schools Marshfield HS Track & Field

TRACK & FIELD Coos Bay, Oregon HGE has worked with Coos Bay School District since the 70’s. In the spring of 2000, the Coos Bay School District Board approved the construction of a new athletic track and field for Marshfield High School. Construction included the demolition of the existing sod football [...]

Coos Bay Schools Marshfield HS Track & Field2020-01-20T22:37:07-08:00

17.17A Bay Area Hospital Pharmacy Remodel

Please reach out to CM/GC Perlo Construction for all bidding information - Phone: +1 503-624-2090 Addendum #1 Drawings Project Manual / Specifications

17.17A Bay Area Hospital Pharmacy Remodel2021-10-12T08:50:40-07:00

MHS South Stadium

MARSHFIELD HIGH SCHOOL SOUTH STADIUM Coos Bay School District, Coos Bay, Oregon HGE has provided architectural services to Coos Bay School District since 1970. Our work has encompassed various scopes from simply consultation, to full architectural services. We have also joint-ventured design services on Pirate Hall at Marshfield High School and several projects [...]

MHS South Stadium2020-01-20T11:47:12-08:00

Bandon South Jetty Viewpoint

Bandon South Jetty Viewpoint HGE provided architectural schematic and site design services for the City of Bandon’s South Jetty Park. Project design goals included the following: Define and restore edge of foredun Create clear, ADA accessible pedestrian walkways to improve safety Relocate Park Host Renovate existing Restroom Building (replace fixtures, paint, hardware, [...]

Bandon South Jetty Viewpoint2021-11-17T11:03:47-08:00

Bandon City Shops

Bandon City Shops HGE provided architectural and engineering consulting services for the construction of an approximately 315 foot x 60 foot pre-engineered metal building for the City of Bandon Public Works Department and Bandon Electric Utility. A slab-on-grade foundation was designed for large service truck traffic, and a 1,400 sq. [...]

Bandon City Shops2021-11-17T11:05:49-08:00

MHS Gym & Auditorium Seismic Upgrades

MARSHFIELD HIGH SCHOOL GYM & AUDITORIUM BUILDING SEISMIC UPGRADES Coos Bay School District, Coos Bay, Oregon These projects have been a culmination of 2-3 years of work to increase the performance and safety of the existing iconic structures on the high school campus. HGE successfully performed the initial seismic grant applications for both [...]

MHS Gym & Auditorium Seismic Upgrades2020-01-20T09:59:08-08:00

Coos Bay Schools Needs Assess & Bond Measure Planning

Coos Bay Schools Needs Assess & Bond Measure Planning Coos Bay, Oregon HGE performed an exhaustive study of structural, maintenance, and site improvement needs for Coos Bay Schools. This bond measure met with success in 1998 and many of the issues were addressed. The $10 million bond provided upgrades to [...]

Coos Bay Schools Needs Assess & Bond Measure Planning2021-11-17T11:04:46-08:00

Baker House Adult Alcohol & Drug Rehab Facility

Baker House Adult Alcohol & Drug Rehab Facility HGE was contracted by Baker County for full architectural services. Our services for the project included site survey, soils investigation, building and site design, and construction administration of the Baker County / New Directions Northwest Adult Alcohol and Drug Rehabilitation Building and [...]

Baker House Adult Alcohol & Drug Rehab Facility2021-11-17T11:07:23-08:00

OFCCU Headquarters Building

OREGON FIRST PLAZA - OREGON FIRST COMMUNITY CREDIT UNION HEADQUARTERS BUILDING Coquille, Oregon HGE acted as Project Architect for Oregon First Community Credit Union’s (OFCCU) headquarters and branch expansion program from 2001 to 2015, designing and performing construction contract administration for 16 new and remodeled buildings in Oregon and Washington. The 29,000 sq. [...]

OFCCU Headquarters Building2021-10-19T18:05:30-07:00