About hge2user

This author has not yet filled in any details.
So far hge2user has created 36 blog entries.

OFCCU Grants Pass Regional HQ Building Remodel

OREGON FIRST COMMUNITY CREDIT UNION (OFCCU) GRANTS PASS REGIONAL HEADQUARTERS (HQ) REMODEL Adaptive Re-use from Branch Bank to HQ Building Grants Pass, Oregon This project consisted of converting a small single-story bank branch building into a 2-story regional credit union headquarters (HQ) building. The approximately 10,740 sq. ft. addition to the original building [...]

OFCCU Grants Pass Regional HQ Building Remodel2020-01-20T09:28:56+00:00

Adaptative Reuse Facilities

PORT OF GOLD BEACH CANNERY BUILDING REMODEL Adaptive Re-use from Cannery to Retail & Restaurant Facility Gold Beach, Oregon This project consisted of converting a former fish cannery building into a retail/mall configuration. The exterior of the building was modified to provide new covered walkways and inviting entryways to respond to the goal of [...]

Adaptative Reuse Facilities2020-01-20T09:15:03+00:00

Siuslaw Public Library Addition

HGE was retained by the Siuslaw Library District to provide architectural design, bidding, and construction administration for a library building addition and remodel and has worked with them on a variety of other projects since. The Addition project included: an approximately 1,468 sq. ft. addition to the west side of the [...]

Siuslaw Public Library Addition2020-01-15T13:58:57+00:00

Coos Bay Public Library Pre-Design

HGE was retained by the Coos Bay Public Library Foundation to perform site planning, site analysis, and site design to accommodate library expansion plans and master plan goals. HGE developed three site plan options and comparison cost estimates for each scheme. Goals for expansion include enlargement of the children’s, teen, and [...]

Coos Bay Public Library Pre-Design2020-01-07T08:59:00+00:00

Coquille Indian Tribe

The Coquille Riverwalk was designed to meet the current needs of the community and visitors while mindful of the environmental, social, and economic demands of the future. Located along the Coquille River within City limits, it is reflective of the community’s heritage, history, culture, and economy that was born from the river. The [...]

Coquille Indian Tribe2020-01-07T08:14:25+00:00

Confederated Tribes of Siletz Indians

ADMINISTRATION BUILDING Siletz, Oregon The Administration Building was completed in 1995 for the Confederated Tribes of Siletz Indians. The building was designed for multi-use and features a multi-function roof. The facility is equipped with advanced light control, sound system, and media display capabilities. The building also contains small meeting spaces, a [...]

Confederated Tribes of Siletz Indians2020-01-07T07:45:45+00:00